Expansion of a production hall (dough room) with outbuildings
The project includes the construction of a new dough room, part of the expansion of the existing production site at Lembeke.
The works include structural work, finishing and surrounding construction (adaptation of road works).
New construction of production hall P3bis and offices
The new building will house both offices and production areas. A 150m-long furnace will be installed in the production areas.
The works include closed shell construction, shell finishing and environmental construction (adaptation of the road works).
Construction surface | 8.050 m² |
No. floors | 2 |
Surface surrounding area | 2.050 m² |
Wyckaert is a Grade 8 construction company. We realise projects for the industrial, utility and residential markets.