Execution period
july 2016 – oct 2016
Execution cost
3.908.441 €
Site
Gent

About the project

The construction work formed part of a modernisation plan for the Coca-Cola production facilities in Ghent. An important production hall was fully stripped out and refurbished for the assembly of two new filling lines within a period of three and a half months. A double- and triple-shift system was used to complete the work within the set period. The adjacent production lines remained in operation during the construction work.
The works include structural work, partial finishing and sewage works.

Key information

Construction surface4.263 m²
No. floors1