High-rise production unit

Details

Client
Solutia Europe Bvba
Architect
Grontmij Industry Nv - Zelzate
Execution period
aug 2013 - mrt 2015
Execution cost
2.808.629
Site
Gent

About the project

The Process Tower on the Solutia site in Ghent is 24 metres-tall and constructed in the centre of a lower production building. Site organisation was prepared in detail together with the client to keep the effect on production to a minimum.
The works include structural work and finishing.

Key information

Construction surface200 m²
No. floors1