Extension of Zorgcampus – New construction of assisted living homes

Details

Client
Villa Haletra Vzw
Architect
Aiko Cbva - Architecten en Ingenieurs - Maldegem
Execution period
feb 2017 - dec 2018
Execution cost
4.936.000
Site
Aalter

About the project

Extension of Zorgcampus Veilige Have with 68 spacious assisted living homes spread across two blocks joined to each other by a tunnel for the care staff. The residents have direct access to the swimming pool located between the two buildings. A borehole energy storage field is constructed under the blocks
The works include the structural work.

Key information

Construction surface14.100 m²
No. floors5