Elia Petrol

Details

Client
Cegelec voor Elia
Architect
noA architecten - Brussel
Execution period
apr 2007 - dec 2008
Execution cost
3.026.278
Site
Antwerpen

About the project

Construction of a substation (high voltage and medium voltage) in the port area of Antwerp.
The works include structural work, finishing, technical facilities and landscaping.

Key information

Construction surface 2.300 m²
No. floors 5
Surface surrounding area 2.700 m²