Orthopedagogical centre Huize Terloo

Details

Client
Broeders van Liefde VZW
Architect
VK Engineering - Brugge
Execution period
Aug 2021 – May 2024
Execution cost
€ 4.774.798
Site
Bellingen

About the project

Demolition and reconstruction of the centre, consisting of 5 blocks accessed by connecting corridors.

This project is being phased so that the centre can remain operational during the works.

The job includes structural work, finishing and environmental landscaping.

Key information

Built-up floor area 2.961 m²
Number of building floors 2
Area of environmental landscaping 3.834 m²