New construction of housing and infrastructure

Details

Client
Woonpunt Zennevallei Cvba
Architect
Filip De Mulder Architect Bvba - Wemmel
Execution period
aug 2015 - jun 2017
Execution cost
2.443.503
Site
Sint Pieters Leeuw

About the project

Eighteen new homes were built following the demolition of the existing buildings. The nature of the homes is diverse. There are staircase entrance dwellings and traditional terraced homes, detached homes and apartments. The homes connect two streets, part of which are pedestrian-only with a green zone.
The outdoor area includes outdoor parking facilities for 18 cars and a public road.
The works include structuring, finishing, technical work and environmental engineering.

Key information

Construction surface1.750 m²
No. floors1 tot 4
Surface surrounding area1.170 m²